Ryde Academy
|
![]() Sir Robert McAlpine have been appointed as the main building contractor for the project and the new building will replace the existing ones. The scheme includes a new two and three storey school building, with a flexible school layout for the consolidated 1,500 place 11-16 year old secondary school. There�ll be new sports facilities, including ball courts, external playing fields, a multi-use sports hall and changing facilities. |
Adventure Lodges, Kingswood Centre, Bembridge
|
![]() The lodges are predominately canvas & timber construction & offer an alternative to traditional camping! Each lodge is provided with hot & cold water which serves 2 no. Toilets, 2 no. Wash Basins & 2 no. Showers, while the central yurt provides cooking & washing up facilities. The site cold water pressure is boosted by way of a 3600 litre insulated GRP storage tank and a twin pump booster set. The boosted cold water serve... |
Goldwater Lodge
|
![]() consulting engineers - MLM main contractor - Mountjoy Design & installation of new mechanical services following demolition of a Community Centre in Goldsworth Park, Woking which had been severely damaged by fire. The project involved extensive repair and development work & included the erection of two new single storey extensions. Internal areas were remodeled with new suspended ceilings and partitioning, flooring, windows and doors installed. As a result of these works a completely new mechanical and electrical installation was required to serve the Nu... |
Beaulieu Abbey Church
|
![]() consulting engineers - Martin Thomas Associates main contractor - Clarke's Mechanical Installation of a new oil fired LTHW heating system within the historic Beaulieu Abbey Church utilising new cast iron column radiators. Clarke's Mechanical were also contracted to carry out the builders works associated with the project, this included the demolition of the existing boiler room & the construction of a new larger boiler room utilising traditional materials, stone built walls, oak frame, doors & louvers. |
Bevois Town Primary School, Southampton
|
![]() consulting engineers - Capita main contractor - Mountjoy Installation of new mechanical services including ventilation, domestic services & LPHW heating in a newly refurbished block. |
Jewell Academy, Townsend, Bournmouth
|
![]() consulting engineers - Houghton Greenlees main contractor - Bournemouth Borough Council Fast track refurbishment of the Jewell Academy, comprising the complete installation of new domestic services & LPHW heating during an eight week period. |
Chiller Plant Replacement
|
![]() consulting engineers - Henderson Green main contractor - Mansell Replacement of the existing internal chiller plant & external condensers with two new external Airedale chillers serving the Energy Centre at St Marys Hospital. External pipework carried out in George Fischer 140mm diameter ABS system. |
Gatten & Lake School
|
![]() architect - Atkins consulting engineers - Clarkes Mechanical D&B main contractor - Willmott Dixon Installation of Mechanical Services within the new Gatten & Lake Primary School. The scheme has been procured through the Isle of Wight Council Scape Framework. The building design utilizes the Atkins Sunesis layout & provides a fast track off the peg solution. |
Needles Old Battery
|
![]() Heating upgrade & installation of a new Dimplex air source heat pump. |
Dining & Design Technology Block, Ryde School
|
![]() Further details can be found on the Project Information Sheet link. |
Royal Yacht Squadron
|
![]() |
Sandown High School Lecture Hall & Reception
|
![]() architecht - ERMC consulting engineers - Henderson Green main contractor - Osborne new sixth form, lecture hall & reception area with underfloor heating, displacement ventilation & solar hot water heating |
Busy Bee Garden Centre
|
![]() consulting engineers - Green Wood Building Services Consultants main contractor - Stoneham Construction Installation of mechanical services to serve the new Busy Bee Garden Centre, Including, new gas fired boiler plant & underfloor heating system to serve the sales area and Cafeteria. Domestic hot & cold water to serve the Cafeteria & WC areas. Ventilation systems to serve the Cafeteria & WC areas. Above ground drainage & sanitary ware. |
National Oceangraphy Centre, Southampton
|
![]() consulting engineers - Capita main contractor - Clarke's Mechanical Removal of 1 no. existing Ryobi boiler & installation of a new Hamworthy Wessex Modumax Boiler comprising 9 no. Gas Fired Boiler Modules c/w Merley Boiler Sequencer. Installation of 1 no. Armstrong Pump set Upgrade of the existing distribution pipework, valves, BMS & flue system. |
Ninham Holiday Park Facilities Building
|
![]() Design & installation of mechanical services to serve new Facilities Building. The building's high hot water demand is assisted by the integration of a solar thermal hot water system. |
Salvation Army Hostel Ryde
|
client - Salvation Army architect - ERMC consulting engineers - Greenwood Building Services / Clarkes Mechanical main contractor - Stoneham Construction design & build project to provide mechanical & electrical services to new sheltered accmodation block services include underfloor heating, ventilation, heating & domestic services |
Sixth Form College
|
![]() architecht - Pick Everard consulting engineers - Greenwood Building Services / Clarkes Mechanical main contractor - Miller design & build project to provide mechanical & electrical services to new sixth form block, services include heat recovery, VRF heating & cooling, rain water harvesting, intelligent lighting & controls |
Hospital Sterile Decontamination Unit (HSDU)
|
![]() architecht - Studio 4 consulting engineers - Henderson Green main contractor - Mansell Installation of new steam boiler plant, steam plate heat exchangers & associated mechanical services to serve new sterilization equipment |
Newclose County Cricket Ground
|
![]() architecht - Macaire Associates consulting engineers - Design & Build main contractor - Williams Associattes new County Class Cricket Ground & Club House with High Efficiency ACV tank in tank hot water generator / boiler |
Solent Middle School
|
![]() architect - ERMC consulting engineers - Rainey Petrie Johns main contractor - Osborne new science classroom extension with underfloor heating |
Carisbrooke Shipping
|
![]() architect - ERMC main contractor - Stoneham new office building with gas fired heat pumps, vrf ceiling cassettes & central heat recovery |
Isle of Wight College Learning Resource Centre
|
![]() architect - Rainey Petrie Johns consulting engineers - Rainey Petrie Johns main contractor - Stoneham Construction new central resources building incorporating library, IT suite & lecture rooms with vrf multisplit air conditioning, heat recovery with tempered supply air & traditional lphw heating system heated by a gas fired modular boiler installation |
Wootton Primary School Pre School
|
![]() architect - ERMC consulting engineers - Henderson Green main contractor - Osborne new pre-school building with radiant ceiling panels & stand alone gas fired boiler |
Earl Mountbatten Hospice Ward Extension
|
![]() architect - Mike Craddock consulting engineer - Henderson Green main contractor - MCM Construction |
Carisbrooke High School Art Block
|
![]() architect - ERMC consulting engineers - Henderson Green main contractor - Osborne |
All Saints Primary School Pre School
|
![]() architect - ERMC consulting engineers - Henderson Green main contractor - Osborne |
Dinosaur Isle
|
![]() architecht - Rainey Petrie Johns consulting engineers - Rainey Petrie Johns main contractor - Leonard Field Construction |
Isle of Wight College Teaching Block
|
![]() architect - Rainey Petrie Johns consulting engineers - Rainey Petrie Johns main contractor - MCM Construction |
Sandown High School sports hall
|
![]() Isle of Wight Council Solar Hot Water Installation & Boiler Replacement |